Home » Oracle » Isolating post-upgrade concurrent programs to a separate manager queue in R12.2

Isolating post-upgrade concurrent programs to a separate manager queue in R12.2

R12.2 upgrade is a big upgrade with lot of technology changes.To save some time during the upgrade process and reduce the downtime, Oracle process few update as part post-upgrade concurrent programs. This article gives description about Isolating post-upgrade concurrent programs R12.2

1)The downtime portion of the upgrade involves the automatic submission of 95 distinct concurrent programs.

 2) These programs will run in multiple threads, so the total number of concurrent requests that form part of the post-upgrade step is much higher.

3) These programs will be picked up and executed by the concurrent manager once the system is up, and as such their execution will be mixed with the execution of ongoing concurrent jobs in the system.

 4) We can define a separate concurrent manager queue to Isolating post-upgrade concurrent programs. This can be achieved by using inclusion and exclusion rules to prevent other manager queues (such as the standard manager) from picking up these requests, and cause this new manager queue to process only these requests. Doing this allows you to control the number of target processes allocated to these post-upgrade concurrent programs, with the use of work shifts.

 5) After the upgrade is complete and before starting the concurrent Manager you need to perform the following steps to create new program type and managers to run the post-upgrade requests.

 

 

To create a new program type, and include a program in that program type:

1. Log in to Oracle E-Business Suite as SYSADMIN, and navigate to System Administrator > Concurrent : Program > Type

 

Name: R12.2UPG

Application: System Administration

Description: Program Type for Post Upgrade Request

2. Include programs from the above list into this new program type.

3. Navigate to System Administrator >Concurrent: Program >Define

4. Search for Program “Drop obsolete products schema ” and Type (choose): R12.2UPG

5. Do the same for other programs in the list.

 

 

 

To exclude a program type from the Standard Manager:

1. Log in to Oracle E-Business Suite as SYSADMIN and navigate to System Administrator > Concurrent : Manager> Define

2. Search for Standard Manager.

3. Click on Specialization Rules.

4. Go at the bottom of the list to add a new record.

5. Include/Exclude (choose): Exclude

 

Type(choose): Request Type

Application(choose): System Administration

. Name(choose): R12.2UPG

This need to be done on standard manager only

 

  

 

To create a new concurrent manager and include a program type:

1. Log in to Oracle E-Business Suite as SYSADMIN and navigate to System Administrator > Concurrent: Manager > Define Check the Enabled box.

2. Enter the following to create the new concurrent manager:

 

Manager: R12_Post_Upgrade_mgr

Short Name: R12PU

Application(choose): Application Object Library

Description: New manager queue for R12 post upgrade requests

Type(choose): Concurrent Manager

Cache Size: 1

Program Library Name(choose): FNDLIBR

Specialization Rules:

Include/Exclude(choose): Include

Type(choose): Request Type

Application(choose): System Administration

Name(choose): R12.2UPG

Work Shifts:

Work Shift (choose): Standard

Processes: Enter a Value

Sleep Second: 30

 

 

After completing the above steps, Activate Concurrent Manager

Note that after all these post-upgrade requests run, you should revert the exclusion/inclusion of managers and programs to the original state, removing the new program type and new manager. This is necessary as some of the programs in the list may need to run in the future, as part of the regular system batch processing requirements rather than part of the upgrade.

 The list of Programs which are submitted with R12.2 Upgrade are

Application Name Concurrent

Program Name

USER CONCURRENT PROGRAM NAME

 

Total request
ADMIN ADDRPOBS Drop obsolete products schema 74
Application Object Library (FND) AFFURGO2 Sync responsibility role data into the WF table. 1
Application Object Library (FND) AFLOBBLD Rebuild Help Search Index 3
Receivables (AR) ARGLTP General Ledger Transfer Program 1
Receivables (AR) ARHDQCMAL DQM Compile All Rules 1
Receivables (AR) ARHDQM DQM Staging Program 1
Oracle Order Capture (ASO) ASOPAUPD Update Parallel Approvals Data 3
Application Implementation (AZ) AZR12UPGRADE iSetup R12 Upgrade Selection Sets Column 1
Application Object Library (FND) B21053695 Bug21053695 3
Incentive Compensation (CN) CN_FORMULA_GEN Generate Formula Packages 1
Incentive Compensation (CN) CN_R1212_CNSRPTXN CN_R1212_CNSRPTXN 18
Oracle Service (CS) CS_KB_SYNC_SOLUTIONS_INDEX Knowledge Management Solution Index Synchronization 1
Application Object Library (FND) DIAGPATCHINGCP Diagnostics patching CP 1
Application Object Library (FND) FDFCHY Compile value set hierarchies 1
Application Object Library (FND) FDFCHY General Ledger Transfer Program 1
Application Object Library (FND) FDFCMPN Compile Non-Compiled Flexfields 1
Application Object Library (FND) FDFVGN Flexfield View Generator 599
Application Object Library (FND) FNDIRLOAD FNDIRLOAD 18
Application Object Library (FND) FNDIRLPP iRep Loading Post Processor 6
Application Object Library (FND) FNDLOAD Generic Loader 5
Application Object Library (FND) FNDSCMPI Compile Security 2
Application Object Library (FND) FNDWFDSRHP Workflow Role Hierarchy Propagation 68
Application Object Library (FND) FNDWFDSURV Workflow Directory Services User/Role Validation 1
Oracle General Ledger (SQLGL) GLSTFL General Ledger Accounting Setup Program 167
Receivables (AR) HZ_THIRD_PARTY_UPDATE Third Party Data Integration Update 1
Asia/Pacific Localizations (JA) JAINDFOBS India – Remove India Localization contexts from DFFs 1
Advanced Supply Chain Planning (MSC) MSCHUBM Maintain APCC Data Model 3
Advanced Supply Chain Planning (MSC) MSCQFM Migrate Personal Queries to SP Work Area 3
Advanced Supply Chain Planning (MSC) MSCREFMV Refresh Materialized Views 1
Trade Management (OZF) OZFMIGUTLREC Migrate Accruals for Multi Currency Changes 1
Oracle Retail Point-of-Service (POS) POSUPFCONFPRG POS Insert Onboard Configuration Details 3

 

See also  ORA-01652 Solutions

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top